Project info Beetham Tower

proj_beetham_tower

OBJECT: Beetham Tower, Manchester

BUILDING OWNER: Beetham Organization

CONSTRUCTION CARRIED OUT BY: Carillion Construction Ltd.

PLANNING: Ian Simpson Architects

TOTAL USABLE FLOOR SPACE: 45.067 m²

LOCATION: 301 Deansgate, M3 4LQ, Manchester, England,

FAÇADE CONSTRUCTION: Bug-AluTechnik GmbH, A-6921 Kennelbach

PROJECT: Structural glazing façade

SCOPE OF PROJECT: 22.000 m² SG façade

TOTAL CONSTRUCTION COSTS: 220 Mio. Euro

PRODUCTSSG façade with thermal and solar protection thermopane glazing 67/34, 1.1 W/m²K, consisting of:
exterior: 10-mm TSG Sicuro, in part with screen print SG print with custom design;
interior: LSG Siculamit; in the atrium area: thermopane glazing with point mounting (system: Steindl SG point)

STAR OF CONSTRUCTION: February 2004

COMPLETION: November 2006

Projektinfo im PDF-Format...